eagle Controls Projects

eagle Controls has nearly 40 years of experience working with institutions across a wide range of applications and facility types. We have the capacity to design and install, and commission systems and equipment to meet the demanding climate conditioning needs of schools, universities, governmental buildings, and places of worship.


Mascoutah School District

Mascoutah, IL

Project Scope: Retrofit Building Management System (BMS) on entire middle school building for the Mascoutah, IL school district.

eagle Controls work entailed:

  • Control of (1) air cooled chiller and (2) hot water reheat boiler systems in the plant.

  • Delta BACnet integration into three multi-zone VAV RTUs and DDC integration of five single zone RTUs.

  • Retrofit of 32 fan coils, 33 unit ventilators, 37 air terminals, 15 VAVs and 30 exhaust fans with Delta DDC controls.

    eagle Controls currently manages all five of the district’s buidings with Delta Controls.


Nashville Yards Tower 1

Nashville, TN

Project Scope: Spec and install Building Management System (BMS) on a new-build 20-story, 566,000 square-foot office building and 600,000 square-foot parking garage in downtown Nashville. The high-rise is occupied by Amazon and is part of the high-profile, Nashville Yards development.

eagle Controls work entailed:

  • Water-cooled heat pump air handling system for each floor with supply and exhaust-air control for each level (fan-powered terminal unit heating.)

  • Stairwell/elevator pressurization control

  • Fire/smoke damper monitoring throughout the building

  • CO/NO2 monitoring and ventilation control for 11-level parking garage


St. Louis, MO

Benson Hill

Project Scope: Install Building Management System (BMS) to support a new, 50,000 square-foot laboratory-grade grow facility for agtech owner, Benson Hill.

eagle Controls work entailed:

  • Controls for an air-cooled, chilled water system for plant chamber temperature control

  • Laboratory roof top DX systems with hot gas reheat

  • Domestic hot water control

  • CO/NO2 ventilation control for shipping and receiving dock

  • DX RTUs for office space


Granite City, IL

icon Mechanical

Project Scope: Installation of Building Management System (BMS) throughout a new, two-story 40,000 square-foot office building.

eagle Controls work entailed:

  • Multi-zone DX VAV RTUs, VAVs and FTUs for comfort control

  • Demand-control ventilation for conference rooms and common areas


Albion

Nashville, TN

Project Scope: Installation of Building Management System (BMS) for 20-story, high-end, residential condominium building in downtown Nashville’s Gulch region.

eagle Controls work entailed:

  • Air-cooled chilled water system supplying temperature control to fan coil units for zone temperature control

  • Integrated BMS control of (3) energy recovery units for building fresh air ventilation

  • Stairwell pressurization control and monitoring throughout the building

  • CO/NO2 monitoring and ventilation control for four-level parking garage

We are proud to deliver the best market solutions to our customers.